Sold Out KDR™ AU and Manual OTC Systems – Oct 22 – Oct 25

Event Phone: 919-792-6420

We're sorry, but all tickets sales have ended because the event is expired.
  •  October 22, 2019 - October 25, 2019
     9:00 am - 5:00 pm

Daily Schedule (start and end times) can be found in Course Specifications section below.  Please review.

Course Objective:

This seminar will provide each attendee with the skills to efficiently service and install the following components of Konica Minolta DR systems:

-KDR™ AU System
-Sedecal SHF Generator
-AeroDR Detectors
-Siemens 3D Tube Hanger
-Sedecal NET Table

Note: Last day end time: 12:00PM.  See details in Course Specifications below.

Additional Information:

Prerequisites

  • Minimum two (2) years X-ray service experience
  • Windows operating system experience
  • Ability to read and comprehend schematics drawings
  • Minimum two (2) years electronics trouble-shooting experience

Target Audience

Service Engineers

Course Specifications

Course Length: 4 days
Hours: Tue – Thurs: 9:00AM to 5:00PM
Friday: 9:00AM – 12:00PM
Lunch will be served at 12:00 

Course Topics


Topics may vary depending upon prior class knowledge and experience

Day 1: 

Overview

  • Mission statement
  • Advantages of Digital Radiography
  • Course expectations
  • Safety overview
  • Introduction to  manuals

Overview of the KDR™ AU

  • Design and similarities
  • Site planning guides
  • Minimum room requirements
  • Mandatory site preparation
  • Sub-assemblies
  • Theory of operation
  • Interfaces to other elements
  • Introduction to the major system components
  • Review diagram of interconnect cables

Day 2: Sedecal Generator

  • Installation process
  • Configuration of tube and stator
  • Workstation setup
  • Calibration
  • AEC
  • Circuit analysis
  • Troubleshooting

Day 3: Overview of the DR Panels

  • Review the multiple components
  • Basic operation of a Flat Panel
  • Optimal performance specifications
  • Sub-assembly
  • Theory of operation

Lab

  • Identify replaceable components
  • Connect & wire Imaging Detector
  • Configure & calibrate the stand
  • Configure & calibrate the generator

 Ultra Software

  • Application of Tech Service
  • Log-in requirements
  • Operation of the  Ultra application
  • Image acquisition
  • Scheduling & performing studies
  • Navigating images
  • Send & print image functions
  • Dicom Configuration
  • Service level philosophy

Day 4 (half day):

  • OTC Installation process
  • Site planning
  • Calibration
  • Review of generator, positioners and panels
  • Troubleshooting
  • Feedback

 

Venue:  

Address:
2217 US-70 BUS, Garner, North Carolina, 27529, United States