Cancelled [UE05J34] Floor Mount and Manual OTC Systems – May 7 – May 9 – CANCELLED

Event Phone: 919-792-6420

We're sorry, but all tickets sales have ended because the event is expired.
  • Day 1 - Day 2
     May 7, 2024 - May 8, 2024
     8:30 am - 5:00 pm
  • Day 3
     May 9, 2024
     8:30 am - 4:00 pm

Course Objective:

This seminar will provide each attendee with the skills to efficiently service and install the following components of Konica Minolta DR systems:

-Sedecal Floor Mount System
-Sedecal Generators
-AeroDR Detectors
-Siemens 3D Tube Hanger
-Sedecal NET Table
-Ultra Software

Note: Last day end time: 4:00PM.  See details in Course Specifications below.

Additional Information:

Prerequisites

  • Minimum two (2) years X-ray service experience
  • Windows operating system experience
  • Ability to read and comprehend schematics drawings
  • Minimum two (2) years electronics trouble-shooting experience

Target Audience

Service Engineers

Course Specifications

Course Length: 3 days
Hours: Tue – Wed: 8:30AM to 5:00PM
Thu: 8:30AM to 4:00PM
Lunch will be at 12:00 

Course Topics


Topics may vary depending upon prior class knowledge and experience

Day 1: 

Overview

  • Mission statement
  • Advantages of Digital Radiography
  • Course expectations
  • Safety overview
  • Introduction to manuals

Overview of the Sedecal Floor Mount System

  • Site planning guides
  • Minimum room requirements
  • Mandatory site preparation
  • Sub-assemblies
  • Theory of operation
  • Interfaces to other elements
  • Introduction to the major system components
  • Review diagram of interconnect cables
  • Floor Mount Installation

Day 2:

Sedecal Generator

  • Installation process
  • Configuration of tube and stator
  • Workstation setup
  • Calibration
  • AEC
  • Circuit analysis
  • Troubleshooting

Overview of the DR Panels

  • Review the multiple components
  • Basic operation of a Flat Panel
  • Optimal performance specifications
  • Sub-assembly
  • Theory of operation

Lab

  • Identify replaceable components
  • Connect & wire Imaging Detector
  • Configure & calibrate the stand
  • Configure & calibrate the generator

Day 3:

Ultra Software

  • Application of Tech Service
  • Log-in requirements
  • Operation of the Ultra application
  • Image acquisition
  • Scheduling & performing studies
  • Navigating images
  • Send & print image functions
  • DICOM Configuration
  • Service level philosophy

Siemens Manual OTC System:

  • Introduction to Siemens Manual OTC System
  • Siemens OTC Installation process
  • Site planning
  • Calibration
  • Review of generator, positioners and panels
  • Troubleshooting
  • Feedback

 

Venue:  

Address:
2217 US-70 BUS, Garner, North Carolina, 27529, United States